PEDESTRIAN BRIDGE OVER THE DUERO RIVER (ALMAZAN, SORIA)
- Location: Almazan (Soria) SEE MAP
- Scope of Works: Detailed Design and technical assistance during the construction
- Structural type: Prestressed concrete spannband (tensional band)
- Construction process: Precast slabs placed on prestressed tendons
- Overall length: 173,0 m
- Spans: 15,0+4×35,0+18,0 m
- Deck width: 3,25 m
- Deck maximum height: 4,0 m
The pedestrian bridge is a prestressed concrete deck of 173 m total length. The structural scheme is a “spannband” (tensional band); there are 6 spans, being the length of each span 15,0+4×35,0+18,0 m supported by 2 prestressed tendons ( 28Ø0.6″;ultimate load equal to 757 tons), anchored to the abutments. The deck is 0.25 m deep and 3,25 m wide.
The deck is made of 0,25×3,25 m precast slabs that are directly placed on to the prestressed tendons. There are 11 slabs on the central spans and 5 to 6 slabs on the lateral spans.
The concrete piers are poured on site. They are “V shape” piers with four arms, and connected at their base using a plastic hinge 5 cm thick. The top of the pier is a 6 m long curved slab.
Each abutment is a 3,25×3,50 m rectangular concrete block where the tendons of the deck and the anchors of the foundation are connected.