The International Bridge over the River Miño at Tuy (Pontevedra)

Bridges and Viaducts · Continuous or Girder Bridges

International Bridge over the Miño River at Tui (Pontevedra)

Back to list
Puente Internacional sobre el río Miño en Tuy (Pontevedra) – foto 2Puente Internacional sobre el río Miño en Tuy (Pontevedra) – foto 3Puente Internacional sobre el río Miño en Tuy (Pontevedra) – foto 4Puente Internacional sobre el río Miño en Tuy (Pontevedra) – foto 5Puente Internacional sobre el río Miño en Tuy (Pontevedra) – foto 6

Project description


The International bridge over the Miño River is on the motorway linking Tui (Spain) and Valença do Minho (Portugal). It consists of two twin structures, one for each carriageway, 380 metres long. It is straight in plan.

The deck is a three-span frame, fixed to the piers and supported on the abutments through PTFE-elastomeric bearings.

The total length of the bridge is divided into three spans of 105.0+170.0+105.0 metres, built by the balanced cantilever method, except for the 23.40 m of deck next to the abutments, which are built on conventional falsework resting on the ground.

The deck is a single-cell box whose depth varies parabolically between 9.00 m over the piers and 3.60 m at the centre of the main span and in the zone built on falsework. The box is 6.50 m wide, with 2.95 m cantilevers. The 12.40 m wide top slab has a constant thickness of 0.22 m. The bottom slab thickness varies between 1.25 m at the pier roots and 0.22 m at the centre of the main span and in the falsework zone of the side spans. The webs have a constant thickness of 0.45 m.

The piers are reinforced concrete walls with a rectangular section, 7.00 m wide and 1.00 m thick, 7.00 m apart, founded on 12 piles of 2.00 m diameter with independent pile caps.

Both abutments are closed reinforced concrete abutments with return wing walls, on spread footings.

The deck is built by the balanced cantilever method.