Project description
The old Carabanchel Greyhound Stadium, on Calle Vía Carpetana, was built in 1953 on a 2 ha site. It had a covered grandstand, a greyhound racing track and outbuildings used as kennels. The grandstand was designed by Eduardo Torroja.
The solution designed for the stadium site and the remodelling works had a twofold aim: to solve the urban problems of the surrounding area and to recover the facility for sports use, as set out in the General Plan. To do this, in the area between the track and Calle Zaida, the kennels had to be demolished, walls built and a large fill placed, the base of the embankment consolidated and the surroundings landscaped.
Both the value of the grandstand as a historic work of engineering and the difficulty and cost of demolishing it made its restoration and conservation necessary. This was designed and carried out, and the opportunity was taken to turn the old greyhound stadium into a new regulation velodrome able to host official cycling competitions, including, besides the cycle track, gymnastics halls, ten squash courts, two fronton courts, four tennis courts, two multi-sports courts and a skating rink. A later remodelling turned it into a sports centre with a football pitch.