Rehabilitation of the Bridge over the Duratón at Peñafiel (Valladolid)

Structural Rehabilitation

Rehabilitation of the Bridge over the Duratón at Peñafiel (Valladolid)

Back to list
Rehabilitación del Puente sobre el Duratón en Peñafiel (Valladolid) – foto 2Rehabilitación del Puente sobre el Duratón en Peñafiel (Valladolid) – foto 3Rehabilitación del Puente sobre el Duratón en Peñafiel (Valladolid) – foto 4Rehabilitación del Puente sobre el Duratón en Peñafiel (Valladolid) – foto 5

Project description


The bridge over the River Duratón is located at km 307+700 of the N-122 road from Soria to Valladolid, where it passes through Peñafiel. It is a three-hinged reinforced concrete arch spanning 40 m, with a rise of 5.70 m. The arch is 1.15 m deep and as wide as the deck it carries. The deck is connected to the arch by 5 groups of posts on each side of the crown. The posts are concrete and the deck is a 0.25 m thick reinforced concrete slab with 0.5 m deep ribs. The deck is 13.40 m wide. The approach from the Valladolid side is a plain-concrete barrel vault with ashlar facing, spanning 5.0 m.

In October 1999 the Directorate General of Roads of the Ministry of Public Works awarded José A. Torroja, Oficina Técnica S.A. the consultancy and assistance contract to prepare the “Repair Project for the Bridge over the River Duratón”, which first required a special inspection of the bridge and a structural analysis.

The damage observed did not seem to indicate load-bearing problems. The concrete cores showed a good general appearance and an estimated characteristic strength acceptable for this type of structure, and the chemical tests showed moderate deterioration of the materials, with chloride and sulphate contents at the threshold of acceptability.

As a result, the work focused on three main areas:

Waterproofing and drainage of the deck, which in turn required removing and then replacing the surfacing and, of course, providing suitable expansion joints both at the centre and at the ends of the structure.

Repair of deteriorated elements, including replacement of the crown hinge and treatment of the surface defects recorded.

Functional and aesthetic recovery of the bridge, including restoring its original vertical alignment and removing visible utility cables, placing them in protected ducts provided for the purpose.