Rehabilitation of the Palacio de Altamira Bridge (Elche, Alicante)

Structural Rehabilitation

Rehabilitation of the Palacio de Altamira Bridge (Elche, Alicante)

Back to list

Project description


The purpose of this work was to prepare the Rehabilitation Project for the Palacio de Altamira Bridge over the River Vinalopó, in the town of Elche (Alicante), based on the findings and conclusions of the special inspection and assessment of the bridge previously carried out by José A. Torroja, O.T. for Elche City Council.

The Altamira bridge is a concrete structure with a central span over the River Vinalopó and two approach sections over the riverbanks. The ribbed deck is of reinforced concrete. In the central span it rests on four shallow arches spanning 42 m with a rise of 6.0 m, of constant section, with open spandrels and rectangular posts. The approach sections, each with two 10 m spans, are also ribbed.

The bridge was in a poor state of conservation. This affected structural elements in specific places (cracks, delamination and spalling with exposed reinforcement, etc.), due less to structural causes than to functional ones, but it was most evident in the functional elements: the deck surface, cracks in the sidewalks and blocked gullies, and the condition of the edge beams and the crash barrier.

Once all this damage had been assessed, the rehabilitation works were carried out. Work was done on:

Deck, equipment and utilities: all elements were replaced, including surfacing, edge beams, crash barriers and signage.

Structure: repair of cracks, efflorescence and areas with exposed and corroded reinforcement, with a final protective coating over the whole structure to give all surfaces a uniform appearance.

Aesthetics: in addition to the above and the removal of graffiti, the masonry of the pylons, abutments and wing walls was completed.

Surroundings: repair of the access stairs, work on the riverside promenade, and treatment of the slopes with irregular stone pitching.