Project description
The project defines the platform improvement of the N-403 road from Toledo to Valladolid via Ávila, from km 0 to km 39.8, between the city of Toledo and the junction with the N-V road at Maqueda (Toledo), over a length of 39.1 km.
It includes correcting the alignment in specific areas, widening the carriageway by widening cuts and extending embankments, extending culverts, strengthening the pavement and surfacing the shoulders, improving the at-grade junctions, improving the urban sections in Toledo (on its way out of the city), Rielves and Val de Santo Domingo, with their urban development, redesigning the drainage, new signage, delineation and barriers, and relocating the utilities affected by the works.
In the alignment, unsuitable radii, crests with short vertical curves and long steep grades that reduced the capacity of the road were corrected. A design speed of 80 km/h was adopted, with a minimum radius of 250 m, and the vertical alignment was corrected to improve sight distance. The typical section has a 7 m carriageway with 1.50 m shoulders. Everything is surfaced with asphalt.