Road Infrastructure · Roads
Service Roads and Junction on the N-I, km 25.3 to 26.6 (Madrid)
Back to listProject description
The developers of Sectors 1BB and 12A in San Sebastián de los Reyes commissioned TORROJA to carry out this work, which includes the accesses to these developments through the construction of the service roads of the A-1 Madrid–Burgos motorway on both sides of the road between km 25.3 and 26.6, and a junction with an overpass over the motorway to connect both service roads and give access to the Club de Campo development. The accesses to the Sector 1BB development and to a service station are also included.
The project and works, carried out in two phases, cover a total of 2.6 km of one-way service road with two lanes plus shoulders and a total width of 9.50 m, including the relocation of affected utilities (a Ø2000 mm water supply main, medium-voltage power lines, a high-pressure gas network and a telecommunications network), signage and lighting.
The junction, at km 26.6, is a two-way “trumpet” junction, with a sidewalk providing pedestrian links between the bus stops planned on both sides of the motorway.
The overpass bridge is 77 m long and 11.70 m wide. It has 3 spans of precast pre-tensioned U-beams of variable depth, with precast piers of variable width that widen towards the top. The abutments and embankments are built with reinforced earth walls.