Project description
The project is part of a water supply system for Bilbao: a 270 m long continuous beam crossing the River Nervión near the town of Etxebarri, south of Bilbao.
The structure is a pipe acting as a continuous beam, with 10 spans of approximately 27.0 m, except span 2, which crosses the river and is 50.0 m long. The steel pipe has an inner diameter of 1.83 m. It is self-supporting over the first 7 spans, but to cross span 2 over the river and the adjacent spans 1 and 3, its cross-section is strengthened with a bottom chord joined to the pipe by two solid webs.
It rests on 9 reinforced concrete piers of constant 1.0 m depth and width varying between 2.84 and 3.80 m. The piers have deep foundations on piles.
The pipe was erected by crane, except for the section over the river, which was launched from both banks and welded at the centre of the 50 m span.