Project description
The storm-water drainage network of the Sector R-8 “Los Hueros” development, in the municipality of Villalbilla, is divided into two main catchments that meet at the planned outfall into the Anchuelo stream, to the south of the site.
Two independent storm attenuation ponds were designed, one for each sub-catchment, located on available land not suitable for development and as close as possible to the outfall into the stream. Their purpose is to attenuate the storm-water flows of the 15-year flood from the newly developed Sector R-8, so as to avoid discharges that would alter the normal hydraulic conditions of the Anchuelo stream as it is today, and so that the ordinary discharge from the network is similar to that before development.
The “North” pond is built in open excavation in the natural ground. The slopes are lined with gabions to withstand the different floods, and a ramp gives access to the inside. It has an area of 2,060 m2, roughly rectangular, and an average depth of 1.90 m, giving a storage capacity of 3,914 m3, with an average longitudinal gradient of 2.37%, the same as the Ø1500 mm sewer it intercepts. It includes an inlet structure connecting to the sewer and an outlet structure for discharge and attenuation control with a Ø500 mm outlet. An overflow and a final Ø1500 sewer protect the downstream infrastructure if the outlet becomes blocked.
The “South” pond has the same features as the previous one; with an average depth of 1.70 m and a longitudinal gradient of 1%, it provides a capacity of 3,502 m3.
With these works, a peak flow of 8.22 m3/s is attenuated to 1.49 m3/s, which is the flow discharged into the stream.