Water Supply Main (Madrid)

Projects · Special Projects

Water Supply Main (Madrid)

Back to list
Aducción de abastecimiento de agua (Madrid) – foto 2Aducción de abastecimiento de agua (Madrid) – foto 3Aducción de abastecimiento de agua (Madrid) – foto 4Aducción de abastecimiento de agua (Madrid) – foto 5Aducción de abastecimiento de agua (Madrid) – foto 6

Project description


The water supply main for the Sector R-8 “Los Hueros” development in Villalbilla (Madrid) was planned in two phases. The first phase built the connection from the existing pipe at km 21.7 of the M-300 road to a provisional connection with the existing main near km 38.8 of the M-204 road, passing through the 5,000 m3 tank planned within Sector R-8. In the second phase it was extended to the town of Villalbilla. It was designed and built to the standards of Canal de Isabel II of the Community of Madrid, which took over the works.

The main is a 300 mm diameter ductile iron pipe, pressure rating 25 atm, class K9. Its total length is 6,171 m.

The buried pipe runs in a trench along municipal tracks and urban streets, so the affected paving had to be reinstated. It crosses two streams, a road (by pipe jacking), several streets and the AVE high-speed railway, using an existing crossing structure. The pipe joints are flexible push-fit joints, and a total of 16 air valves and washouts and 33 valves of various types were installed in the corresponding chambers.