Project description
The new regulating tank for the water supply of the Sector R-8 “Los Hueros” development in Villalbilla (Madrid) has a total capacity of 5,000 m3, divided into two cells. It is rectangular in plan, with an area of 1,500 m2, and semi-buried to minimise its visual impact given its urban setting. It is built in reinforced concrete waterproofed on the inside, partly on shallow foundations and partly on piles.
It includes a pumping chamber to guarantee a residual supply pressure of 25 m water column, with an FD Ø400 inlet pipe with independent branches for each cell; a double inlet with 2 pressure-reducing valves in series, a filter and Ø400 butterfly valves; an FD Ø400 outlet pipe with intakes in each cell and 3 butterfly valves; FD Ø150 and FD Ø100 pipes to the pumping station with gate and non-return valves; an 8,000 l anti-water-hammer pressure vessel; Ø400 mm ductile iron overflow pipes; drain chambers; a Ø400 butterfly bypass valve with a Ø400 non-return valve; an FD Ø400 drain and overflow pipe; and Ø400 pilot-operated filling valves with butterfly valves.
The pumping station consists of a main set of 3 pumps (1 on standby) with 45 kW motors and a capacity of 84 l/s per pump at a head of 40 m, another set of 2 pumps for lower (night-time) demand, a hydropneumatic vessel, soft starters, connecting pipes, valves, sleeves, joints, spools and all other necessary equipment.
All the pipework is ductile iron, with diameters of 400, 150 and 100 mm, with flanged joints and stainless steel bolts. Where pipes pass through walls, a flanged wall sleeve is installed and cast in together with the walls.
The work is completed with an overhead travelling crane, the power supply, lighting and sockets, and an automated control panel installed in a dedicated room.