Project description


The PAU II-6 Urban Development Programme plans a strategic area in the south of the municipality of Madrid. Known as the “Ensanche de Carabanchel” because it borders the old town of this district, it covers 355 hectares. It is bounded on one side by major roads (the M-40, Carretera de Toledo, Avenida de Poblados, Avenida de la Aviación and Carretera de Leganés) and on the other by two established features with a great influence on their surroundings: the Cementerio Sur and the Pinar de San José.

TORROJA took part in drafting its Partial Plan, which won the 8th Urban Planning Award of Madrid City Council in 1993, and is the author of its Urban Development Project.

The development provides for a total of 11,350 homes (6,126 subsidised and 5,224 private), a large shopping centre (Islazul) and an industrial area. It covers not only the development inside the site but also the external connections of its infrastructure, including a 1.6 km walk-through sewer, a 2.4 km water main, the undergrounding of several high-voltage power lines, and provision for a Metro line (Line 11).

The project includes the design of the whole road network with its earthworks, signage, parks and green areas, street furniture, and water supply, sewerage, power, lighting, gas and telecommunications networks: a total of 34.2 km of streets, 59.9 km of water pipes, 100.5 km of sewers, 240 km of power distribution cables, 1,778 street lights, 28.7 km of telephone ducts, 32.3 km of gas pipes, 126,000 m2 of gardens, 1,323 traffic signs, etc. Its construction budget is €92.6 million.