Deck Strengthening of the Bridge over the Guadiana (Badajoz)

Structural Rehabilitation

Deck Strengthening of the Bridge over the Guadiana (Badajoz)

Back to list
Refuerzo de tablero Puente sobre el Guadiana (Badajoz) – foto 2Refuerzo de tablero Puente sobre el Guadiana (Badajoz) – foto 3Refuerzo de tablero Puente sobre el Guadiana (Badajoz) – foto 4Refuerzo de tablero Puente sobre el Guadiana (Badajoz) – foto 5

Project description


The crossing of the River Guadiana at Guareña is a bridge with 7 simply supported spans of 35.0 m. The deck section consists of two 1.40 m deep U-beams carrying a 10 m wide, 0.25 m thick top slab. The piers are of the pile-column type, with 2 circular shafts and truncated-cone capitals.

During an inspection carried out 4 years after construction, inclined cracks were found in the webs of all the beams near the supports, as well as transverse cracks on the soffits of the beams and excessive deflection at midspan.

The study of the load-bearing capacity of the beams carried out by Torroja Ingeniería showed that the cracks in the webs near the supports were caused by insufficient capacity of the bottom longitudinal reinforcement to resist the tension imposed on it by the strut-and-tie model, given the maximum strut inclination compatible with the capacity of the stirrups provided.

It was therefore necessary to strengthen either the longitudinal tie, the web stirrups, or both. Strengthening the longitudinal tie was the most feasible, simple and effective option in this case.

So, in addition to repairing the cracks, because of their poor appearance and the durability problems they could cause, the beams were strengthened by bonding carbon-fibre laminate strips with epoxy adhesive, both on the webs and on the bottom of the box, in the areas near the supports.