Structural Rehabilitation
Rehabilitation and Widening of the Posadas Bridge over the Guadalquivir (Córdoba)
Back to listProject description
The bridge crosses the River Guadalquivir and gives access to the town of Posadas. It was built by Eduardo Torroja in 1940 with a 6.50 m wide deck. It is 284.4 m long and straight in plan. Its deck has been widened to 11.00 m by strengthening and enlarging the bridge deck and modifying the existing piers and abutments.
The five main spans are simply supported, with 43.0 m spans. The decks were composite, made up of a reinforced concrete compression slab resting on two steel trusses with a horizontal top chord and a parabolic bottom chord, 6 m deep at midspan.
The approach sections, the first 20.80 m long and the second 48.60 m, were carried on a series of concrete and masonry arches with a 12.00 m inner diameter.
The final deck of the main spans has kept the original structural type. The number of trusses has been doubled to a total of 4, and the compression slab has been replaced by a 22 cm thick slab with 4 longitudinal ribs, 47 cm wide and 40 to 43 cm deep, that take the top chord of the trusses.
The upper part of the arches in the approach sections was demolished and the deck rebuilt with precast reinforced concrete elements of 3.00 x 5.00 m2 and 42 cm thick, with in-situ concrete joints acting as keys to join them and complete the deck.
The existing piers were enlarged to support the new trusses with two transverse cantilevers attached to 0.25 m thick walls, stitched to the existing pier by 16 prestressed bars passing through it.